Categories: News

A new cycle path overcomes the obstacle of the four-lane road in Juvignac

Spread the love

Une piste qui fait déjà le bonheur des cyclistes. DR – Ludovic Severac – Ville et Métropole de Montpellier

Le segment inauguré permet de relier un quartier qui se situe de l'autre côté de la N 109 au centre-ville de Juvignac et à Montpellier.

While cycle paths encourage cycling, some also allow people to get around previously impassable road obstacles. This was demonstrated this Thursday in Juvignac, with the appearance of a section linking the Allée de l'Europe and the Avenue de Kalkar.

200% Deposit Bonus up to €3,000 180% First Deposit Bonus up to $20,000

“This segment connects the southern third of the town, which is on the other side of the N 109, to the city centre of Juvignac”, explained Mayor Jean-Luc Savy.

It is a much larger development that was inaugurated this Thursday, since it ensures the continuity of the road from Lodève to Juvignac.

“There was a discontinuity in cycling due to a road environment, a recalled Julie Frêche. Thanks to this link, the bicycle becomes a tool for social cohesion”.

In 2023, Montpellier Méditerranée Métropole and the City of Juvignac began work to transform public spaces in the Courpouyran district, at the western entrance to the city of Juvignac.

In 2024, for three months, work continued to provide continuous cycling and pedestrian access to the city center of Juvignac. The developments made it possible to reduce vehicle speeds, develop the town's pedestrian and cycling network, and guarantee the safety of cyclists, pedestrians, and local residents.

New track, new sidewalks…

A 300-metre two-way cycle path has been built, new sidewalks have appeared, the roadway has been resurfaced and the storm water system renovated.

The cost of the work amounts to €819,000, financed by Montpellier Méditerranée Métropole at 66% and the City of Juvignac at 34%.

In conclusion, Michaël Delafosse discussed the complementarity with other forms of mobility by 2030. “The T4A bustram that will serve the west of the metropolis will connect tram line 5 to Genneveaux, and the T4B will use the COM expressway to join tram line 3”, concluded the president of the Metropolis.

Teilor Stone

Teilor Stone has been a reporter on the news desk since 2013. Before that she wrote about young adolescence and family dynamics for Styles and was the legal affairs correspondent for the Metro desk. Before joining Thesaxon , Teilor Stone worked as a staff writer at the Village Voice and a freelancer for Newsday, The Wall Street Journal, GQ and Mirabella. To get in touch, contact me through my teilor@nizhtimes.com 1-800-268-7116

Recent Posts

“Produce more, better and sustainably”: Thierry Blandinières, director of the agricultural cooperative giant InVivo, confirms his strategy

1 700 personnes présentes pour la convention 2024 du groupe Invivo à Paris, ce mercredi. MIDI…

46 minutes ago

As he thought he was going to catch his plane, he was arrested and the authorities discovered a baby crocodile skull in his luggage.

Le crâne était emballé dans du tissu. Twitter Douane indienne A 32-year-old Canadian wanted to…

46 minutes ago

CyberGhost VPN is at a fantastic price (€2.03/month) right now!

© Presse-citron In a world where digital limitations are multiplying, both in terms of access…

46 minutes ago

AdBlue: here is excellent news for diesel drivers affected by breakdowns

© Robin Sabbadini for Presse-citron AdBlue, the anti-pollution fluid required on modern diesel engines, has…

46 minutes ago

Here are 4 films you absolutely must see this weekend at the cinema

© Pathé This beginning of the year is rich from a cinematographic point of view.…

46 minutes ago

The climate verdict is in: 2024 is the hottest year on record

© Piotr Twardowski/Pexels The year 2024 is coming to write its thermal footprint in the…

46 minutes ago