Categories: Business

The technical feat under the Marc-Bloch forecourt, route de Mende, on the construction site of tramway line 5 in Montpellier

Spread the love

Un quartier au pied de l’université totalement métamorphosé. GAU-ARCHI

The intersection between rue du Dr Pezet and route de Mende has undergone major transformations. 

200% Deposit Bonus up to €3,000 180% First Deposit Bonus up to $20,000

A tramway line shapes a city and the most emblematic construction site will probably remain that of the Marc-Bloch square (formerly place de la Voie Domitienne) in front of the renovated Paul-Valéry university. At the start of route de Mende, it is one of the most advanced construction sites. It is also “the most impressive”, according to Julie Frêche. In particular due to the construction of a huge hydraulic retention basin at the corner of rue du Dr Pezet and route de Mende.

A 4,600 m² retention basin

“A construction site in the city centre, managed by the Razel-Bec company. It is a 4,600 m³ basin responsible for solving 90% of flooding problems linked to bad weather”, assures the elected official. Claire Rancoule estimates that the basin, now covered, suffered “two heavy rain events in 2022, when it was dug. Each time it had to be emptied and the sludge cleaned”.

First shelter at a standstill Université Paul-Valéry

A mishap, but the main thing is to have completely transformed the site. In particular, the former 2,000 m² car park has become a huge green space, redeveloped into a huge living space for students and local residents. It is on this forecourt, recently named in memory of this resistance professor who should enter the Pantheon, that the first shelter at the Université Paul Valéry stop will be installed. Probably during the end-of-year holidays. It will also be the first sector connected to the overhead contact line.

I subscribe to read the rest

Teilor Stone

Teilor Stone has been a reporter on the news desk since 2013. Before that she wrote about young adolescence and family dynamics for Styles and was the legal affairs correspondent for the Metro desk. Before joining Thesaxon , Teilor Stone worked as a staff writer at the Village Voice and a freelancer for Newsday, The Wall Street Journal, GQ and Mirabella. To get in touch, contact me through my teilor@nizhtimes.com 1-800-268-7116

Recent Posts

Should you go for a Shark Powerdetec Pro robot vacuum cleaner ?

© Lemon squeezer Dubious, that's the right word. For a long time, robot vacuum cleaners…

25 minutes ago

The 2024 Degas will be awarded to scientist Roman Chabanon for his research into cancer

Roman Chabanon, né à Mende, travaille au centre Gustave-Roussy, à Paris. DR - DR The…

25 minutes ago

It is supposed to stop tumor growth and prevent metastasis: Russia claims to have developed an anti-cancer vaccine

Vladimir Poutine a annoncé en début d'année que la Russie était sur le point de…

25 minutes ago

Michel Planès bows out and leaves a great void in the hearts of the people of Béziers

The eternal smile of an endearing character who had made his professional career at Crédit…

25 minutes ago

Rugby/Federal 2: Millau largely beaten on the Palavas pitch

Millau termine l'année 2024 par une défaite. Midi libre - Théo Costecalde Millau termine l’année…

25 minutes ago

The 2024 Degas will be awarded to scientist Roman Chabanon for his research into cancer

Roman Chabanon, né à Mende, travaille au centre Gustave-Roussy, à Paris. DR - DR The…

1 hour ago